What is the installation sanding process?

  1. We drop materials off the week before to acclimatize
  2. Floor preparation (remove carpet, nails, staples, etc.)
  3. Check and secure subfloor as required
  4. Check moisture readings
  5. Laser in the first row of hardwood flooring
  6. Install floor (glue and nail as necessary)
  7. Clean up
  8. Inspection
  9. The floor is now ready for sanding, staining and coating